|
|

Back to back load testing of DC Machine |

|
|
|
Load testing of
vertical DC Machines |
Quality is the most
important aspect of our business.
Personal attention is paid to each & every
work involved.
We are eqipped with the best testing
equipments to perform test on all types of
jobs.
Testing is carried out at different stages
of rewinding
1. Motor Testing before dismantling
i.e.static testing
2. Flux test on core after stripping for
detection of Hot spots
3. Test during Coil Making
4. Test during & after mounting of coils
5. Testing after assembly
6. Load Testing of DC Machines by Back to
back Method
TESTING
FACILITIES
a) AC / DC Hi Pot Test
b) Surge Comparison Test
c) Tan Delta Test
d) P I Value Test
e) And all other routine tests
f) No Load Running Test.
CLEANING
FACILITIES
a) Steam Cleaning
b) CO2 Cleaning
VACCUM PRESSURE IMPREGNATION PLANT
|
|
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
|
|